Ahuroa Rd Seal Extension – Auckland Transport
As the area between Puhoi and Warkworth developed, so did the traffic numbers over the Ahuroa Hill. Auckland Transport decided that it was time to tarseal the gravel road. Initially starting out tarsealing 1.2 kms, the job continued and Mason Contractors are continuing further kms.
Works Included;
Site clearance
Earthworks. including ground stabilisation
Drainage. Including; Manholes, culverts, catchpits, storm water piping
Retaining Walls
Erosion Control
Pavement construction
Kerb and channel concrete works
Landscaping & fencing
Road signage